We have partnered with Rosy Rose for three years, shipping three 40-foot containers every quarter. On unpacking we have yet to find a single piece of damage or colour mismatch — the stitching and wood veneer match our samples perfectly. Consistent quality, and one of the most dependable suppliers for our showroom.
Custom Furniture Manufacturer in Foshan, China
Rooted in Foshan and specialised in OEM/ODM custom production, we deliver end-to-end furniture manufacturing for distributors, wholesalers and contract buyers worldwide — all built to 100% export-grade quality standards.
Why Choose Us
Our own factory in Foshan, focused on premium, design-led manufacturing
A source-level manufacturer
of high-end furniture in Foshan, China.
Rosy Rose was founded in 1983 and has been rooted in Foshan for over four decades, establishing itself as one of China’s leading high-end furniture manufacturers. Our 200,000 m² factory and 100,000 m² showroom cover the full range of living room, bedroom, dining and office furniture, backed by more than 30 years dedicated to premium furniture production and export.
We supply strictly factory-direct with no middlemen — you receive the same products at factory-direct pricing, with the margin passed straight to our distributors and wholesalers. We also offer a complete one-stop export service, supporting you throughout from drawings and sampling to mass production, customs clearance and logistics, making international trade simpler and more dependable.
Step Inside the Factory →What We Supply
Bedroom · Living · Dining · Office — every category your store needs

Bedroom
- Best sellersgenuine-leather beds · high reorder rates
- Factory-directpricing for distributors

Living Room
- Store favouritesItalian-style leather sofas
- In stockfast lead times · reliable restocking

Dining Room
- High volumemarble dining tables · strong margins
- OEMmade to your designs

Office
- Contract stapleproject & bulk supply
- Export-readyfull containers worldwide
Partnership Models
From wholesale supply and dealerships to deep OEM private-label production — serving distributors, buyers, franchisees and project clients alike.
Furniture Store / Wholesale Supply
Bulk supply at wholesale prices for furniture stores and retailers — flexible MOQs and mixed-container restocking.
Showroom / Dealership
Long-term showroom and dealership partnerships with territorial protection and preferential pricing.
Regional Agency / Franchise
Open a store or represent the brand in your market.
Project Supply
Unified supply plus installation for hotels, model units and whole-home projects.
OEM Private Label
Produced to your drawings and brand, with a 1×20GP container minimum.
Inside Our Factory
From raw material stores to finished, ready-to-ship goods — everything is completed inside our own factory.




A 200,000 m² integrated campus with eight dedicated production workshops, a 16-step quality-control process and 1,200+ staff working shifts. Every timber board and hide moves from cutting and upholstery through finishing to finished-goods loading — all within our own Foshan workshops, never outsourced or passed on. This is why distributors worldwide trust us with their long-term orders.
-
01
Drawings → Cutting
Share your drawings or reference photos and our engineering team replies with a structural plan and quotation within 24 hours; the woodworking shop then cuts and prepares parts to spec.
-
02
Sampling → Mass Production
Once samples are approved, the upholstery shop stitches and manufactures to export-grade standards, with materials and workmanship under full control throughout.
-
03
QC → Container Loading
Every finished piece is inspected individually before loading, then packed and shipped as a full container direct to the port or warehouse you choose.
-
01
Vetted Raw-Material Suppliers
We work with a carefully selected network of long-term raw-material suppliers; every batch of timber, foam, leather and hardware arrives with an inspection certificate, safeguarding consistent quality from the very source.
-
02
Rigorous Quality Control
A 16-step inspection process runs across cutting, stitching, finishing and container loading, with dedicated staff checking every single piece at each stage so no defective goods ever ship.
-
03
High Production Capacity
With a 200,000 m² integrated campus, eight dedicated workshops and 1,200+ staff working shifts, standard production typically takes 30–45 days. For selected bulk orders, dispatch may be possible in as little as 25 days, depending on the confirmed specifications and production schedule. Please confirm the lead time for each order with our team.
How We Work · From Inquiry to Delivery
Every step carries a clear timeline and deliverable, so your project stays trackable from start to finish.
Inquiry
Submit requirements · reply within 24h
Week 01Design & Sampling
3D rendering + physical sample
Week 02-03Quotation & Contract
EXW / FOB / CIF / DDP
Week 03-04Production & QC
full 16-point inspection
Week 04-07Packaging & Shipping
full-container direct dispatch
Week 07-08After-Sales
structural warranty
OngoingThe 7 questions distributors ask most
01 Are you a direct factory?
Yes. We are a 100% source factory based in Foshan. Working with us directly means factory-direct pricing plus transparent production updates — no middlemen taking a cut.
02 What is your minimum order quantity (MOQ)?
Standard catalogue models start from 10 pcs per design; fully custom OEM models usually require a 1×20GP container.
03 What are your payment terms?
30% T/T deposit with the 70% balance settled before shipment; standard letters of credit and trade terms are also accepted. Production takes 30–45 days.
04 Can I request a sample first? Is the sampling fee refundable?
Yes. We courier a complete material package to your office for review before mass production. The sampling fee is fully refundable once you place an order.
05 How do you guarantee quality?
We strictly follow multiple inspection checkpoints and fully inspect every piece before container loading. Certifications including FSC, ISO 9001 and BSCI are all in place.
06 How is logistics arranged?
We offer EXW, FOB Foshan, CIF and DDP (door-to-door), supported by long-term forwarder partnerships that deliver to any port worldwide.
07 Can I visit your factory?
We strongly encourage it. We arrange a dedicated car from Guangzhou Baiyun Airport (CAN) straight to our Foshan showroom and factory, with full hospitality throughout.
What Our Partners Say
Real feedback from partners across the US, Europe, Australia, Singapore, Malaysia and the Middle East
